joecianfarra
Mechanical
- Feb 18, 2015
- 3
I am designing a very small Pre-action System application where the plan is for a single interlocked valve group with electric release and pneumatic pipe supervision. Traditionally I have used a compressor or shop air on rare occasions, however since the piping volume is only 11 gallons I was thinking about Nitrogen gas supervision instead of a 1/6 HP compressor. I figure that this option should be considerable cheaper and shouldn't be too difficult for the fitters to assemble. Is there anything I should be concerned about regarding equipment pricing or installation costs that would surprise me? Thanks Joe C.