Pressure Testing:
I have a plate cooler that will be built in situ offshore (but not in its final location) and the intention would be to complete a hydrostatic test when the unit build is complete.
The unit itself will not be moved into its final location for some months (many reasons) but on doing so, is is advisable to re- strength test, or would a leak test suffice>
I have a plate cooler that will be built in situ offshore (but not in its final location) and the intention would be to complete a hydrostatic test when the unit build is complete.
The unit itself will not be moved into its final location for some months (many reasons) but on doing so, is is advisable to re- strength test, or would a leak test suffice>