Deal All,
I had discussion with an Inspection Engineer of oil and gas plant and He has raised a query that pressure testing of corroded/old piping shall not be carried out at 150% of design pressure. My point of view is that, as far as, minimum required thickness is still available then pressure testing should be done at 150% of design pressure. This minimum required thickness also considers all other loading's apart from pressure design thickness.
can anyone guide on this matter.
Thanks in advance
I had discussion with an Inspection Engineer of oil and gas plant and He has raised a query that pressure testing of corroded/old piping shall not be carried out at 150% of design pressure. My point of view is that, as far as, minimum required thickness is still available then pressure testing should be done at 150% of design pressure. This minimum required thickness also considers all other loading's apart from pressure design thickness.
can anyone guide on this matter.
Thanks in advance