abnabb
Mechanical
- Jul 15, 2010
- 7
I have 2 stage production unit for producing metallic strips. First stage is for the production of countinuous metalic strip. Second stage is for cutting the countinuous strip in equal parts.
Both stages are driven by seperate motors. For a quality cutting process, motion of both stages must be perfectly synchronized.
The cutter moves in 2 axis simultaneously. X axis movement to meet the production flow and Z axis movement for cutting operation.
A problem in quality of cutting process is often experienced. What can be investigated?
Thanks