aganger691
Mechanical
- Jun 2, 2008
- 3
So to start out, I'm more on the mechanical side of the house and my experience with paralleling diesel sets is strictly with hydrualic govenors. I'm working on a two gen set of Cat 3412D's pushing a 500KW gen each. These units were installed in the early 80's and the only documentation that I have is the cut sheets from the install. During my most recent no load test gen 2 had trouble synching up when coming on line. Twice it attempted to synchronize before coming up fully. It was almost as if the contacts were chattering or the automatic synchronizer was hunting for proper voltage or phase requirements. I'm going to run them again this afternoon to see if the problem persists. Any comments or advice would be much appreciated.