Tylamontagne
Petroleum
- Oct 29, 2005
- 4
During the hot summer months(25C +), the throughput of gas through the plant is limited by our refriges. We knock down our refriges on high discharge pressure if we do not flare some of our inlet. Evaporative condensers are not an option because of lack of water. We have two arial air cooled condensers right now. we are currently running water over our disharge piping but this scaling up quick. any hints?