I have been using Ram Concept for about nine months now, and one thing that I have run into is that sometimes, when I have lots of walls constraining my slab, I end up getting less precompression on my section. Say I put 20 tendons into a beam, with an expected precompression of 20*26.8 kips per tendon = 536 Kips effective prestressing force. After doing preliminary checks, 20 tendons appear to be the correct number, plug it into Ram Concept and the section is nowhere close to working. When I do an audit, I see the precompression on the section is a lot less than the 536 kips . . . sometimes it is more like 200 kips.
I am not very experienced at PT Design, but am learning and working under an experienced person. Anyways, this experienced person is used to the PT Data, equivalent frame type of analysis, and he generally scoffs when Concept does something like lowering the precompression down on a section.
Anyways, I am reviewing a design on an underground parking structure done by another firm . . . a very experienced firm in the way of PT Design . . . and this "bleeding" of the precompression that the section should see "shows" that there are a lot of "overstressed" areas. Does this phenomena actually happen, or am I modeling something wrong in the Ram Concept Finite Element Analysis program? Has anybody else ran into this problem?
Thanks for any help that you can provide.
I am not very experienced at PT Design, but am learning and working under an experienced person. Anyways, this experienced person is used to the PT Data, equivalent frame type of analysis, and he generally scoffs when Concept does something like lowering the precompression down on a section.
Anyways, I am reviewing a design on an underground parking structure done by another firm . . . a very experienced firm in the way of PT Design . . . and this "bleeding" of the precompression that the section should see "shows" that there are a lot of "overstressed" areas. Does this phenomena actually happen, or am I modeling something wrong in the Ram Concept Finite Element Analysis program? Has anybody else ran into this problem?