elyaas
Mechanical
- Jan 20, 2013
- 6
Hi Gentlemen,
I am into the Inspection industry, doing WQT and PQR jobs. Can there be different PQR's be considered as supporting document for qualifying a new WPS. The WPS is for cold repair welding on Inconel overlay without PWHT. Base material used is AISI 4130. The process used is GTAW/Manual. The welding process used in the supporting PQR's are (i) SMAW/manual (ii) SAW/machine.
Kindly give suggestions and share your experiences.
I am into the Inspection industry, doing WQT and PQR jobs. Can there be different PQR's be considered as supporting document for qualifying a new WPS. The WPS is for cold repair welding on Inconel overlay without PWHT. Base material used is AISI 4130. The process used is GTAW/Manual. The welding process used in the supporting PQR's are (i) SMAW/manual (ii) SAW/machine.
Kindly give suggestions and share your experiences.