I was wondering if anyone has experience with a project where you had to locate the existing hydronic tubing in a
radiant slab. How did you do it?
I have to put some supports below said slab, and it would be ideal if we could do this with a micropile that can penetrate
between the tubes without ruining them.
Thanks in advance.