I am currently looking to strengthen an existing RC beam & am considering plating the underside. Looking at the concrete, existing steel & new plate composite action what would be the correct way to consider the shear connection between plate & concrete? If using the standard FAy/I type of approach how would "I" be considered?
Also, adhesive or mechanical connection? I have had problems with the former and heard delamination is a problem
with this & fibre reinforcement.
Thanks in anticipation