chief52
New member
- Apr 9, 2008
- 6
I have an existing equipment rack frame made from square 6061-T6 tube. We need to modify the frame geometry, so want to lengthen one tube. We intend to cut the tube between existing welded corner joints and splice in a longer tube. The rework will provide instruction to grind off all existing weld mnaterial at the joint. My concern is at the existng corner joint we will remove existing weld from the tubes and weld the new longer tube back onto the existng corner tubes.
What are people's thoughts related to expected strength of rewelded corner, decrease in expected tensile strength of material at the corner, etc. We do not plan on re-heat treating after welding.
What are people's thoughts related to expected strength of rewelded corner, decrease in expected tensile strength of material at the corner, etc. We do not plan on re-heat treating after welding.