SemiPE
Structural
- May 15, 2013
- 34
For pile caps with three piles (3 piles forming a triangle, column on center), designed using strut-tie method or truss method, aren't the rebars supposedly parallel to the 3 tension chords of the strut-tie/truss model? which in this case would form a triangular shape on plan.
However, on most drawings that I have seen, the rebars arent laid out in this manner. The rebars are often laid parallel to the plan orthogonal axis (Horizontal and vertical axis at right angles). I know it is more practical, but isn't this an incorrect way of laying out the rebars for the tension chord? I dont think that the 2 tension chords, oriented at 60 deg on plan (the third tension chord being parallel with the x-axis) could be converted to an equivalent x & y tension chord.
anyone care to help me on this
However, on most drawings that I have seen, the rebars arent laid out in this manner. The rebars are often laid parallel to the plan orthogonal axis (Horizontal and vertical axis at right angles). I know it is more practical, but isn't this an incorrect way of laying out the rebars for the tension chord? I dont think that the 2 tension chords, oriented at 60 deg on plan (the third tension chord being parallel with the x-axis) could be converted to an equivalent x & y tension chord.
anyone care to help me on this