DHKpeWI
Structural
- Dec 7, 2009
- 164
It is my understanding that the concrete contractor will build from the rebar place (shop) drawings and not the structural drawings. We have a project where the rebar shops don't show a lot of information (like spread footing locations and wall elevations) and the rationale is that the contractor will use the rebars shops and the structural drawings for construction.
How have you handled this?
How have you handled this?