hello,
In wind power generator, power cables are laid vertically along ladder from ground to nacelle of above 100 meters height. The cables are installed in method F according to IEC 60364-5-52(single-core cables with three loaded conductors in trefoil),The clearance between trefoil groups are kept lager than two times the cable diameter, and the trefoil groups are erected on a cable ladder which are installed vertically.
I don't find reduction factors for cable using this installation method in this IEC standard.
Who can provide a reference for ampacity calculation of cable laid vertically in ladder?
Thanks!
In wind power generator, power cables are laid vertically along ladder from ground to nacelle of above 100 meters height. The cables are installed in method F according to IEC 60364-5-52(single-core cables with three loaded conductors in trefoil),The clearance between trefoil groups are kept lager than two times the cable diameter, and the trefoil groups are erected on a cable ladder which are installed vertically.
I don't find reduction factors for cable using this installation method in this IEC standard.
Who can provide a reference for ampacity calculation of cable laid vertically in ladder?
Thanks!