I am dealing wirh a raft foundation with local thickening below the columns.
The general detail i found of bottom reinforcement inside the raft is shown in figure 1. However i dont understand the necessity of the extended part which i have clouded (useless in my opinion).
In such section the splicing is ensured by non contact splices. However the mat has a thickness of 600mm while the thickening is 900mm. I am using aci 318 which for non contact splices spacing between bars being developed should be less than 150mm.
I was thinking of using the detail illustrated in figure 2 in order to ensure that bars are overlapping. What do u think ?
Thank u for the help
I am dealing wirh a raft foundation with local thickening below the columns.
The general detail i found of bottom reinforcement inside the raft is shown in figure 1. However i dont understand the necessity of the extended part which i have clouded (useless in my opinion).
In such section the splicing is ensured by non contact splices. However the mat has a thickness of 600mm while the thickening is 900mm. I am using aci 318 which for non contact splices spacing between bars being developed should be less than 150mm.
I was thinking of using the detail illustrated in figure 2 in order to ensure that bars are overlapping. What do u think ?
Thank u for the help