- Jul 31, 2001
- 22
One of the possible reasons that the UK Steel framed building industry has a major share of the building frame market is that the Contractor carries out all connection design and detailing for the steel frame structure........ saving on the Consultant design time and fees.
The Concrete framed industry is now going down the same route, whereby the contractor is being asked to carry out the reinforcement detailing and scheduling.
Is this the norm elsewhere in the world, and if so, what are the problems experienced with this split approach to the concrete frame design and detailing responsibility?
The Concrete framed industry is now going down the same route, whereby the contractor is being asked to carry out the reinforcement detailing and scheduling.
Is this the norm elsewhere in the world, and if so, what are the problems experienced with this split approach to the concrete frame design and detailing responsibility?