Greetings Engineers,
I am Planning Engineer with contractor firm currently working on high rise building. We are facing an issue of lap location in columns. After raft construction exposed lap length of columns was more than design (200mm more) our team prepared steel for basement with reduced cut length to avoid wastage. Now lapping it 200mm above raft S.S.L (Structure Slab Level). is there any ACI code which give this permission?
I am Planning Engineer with contractor firm currently working on high rise building. We are facing an issue of lap location in columns. After raft construction exposed lap length of columns was more than design (200mm more) our team prepared steel for basement with reduced cut length to avoid wastage. Now lapping it 200mm above raft S.S.L (Structure Slab Level). is there any ACI code which give this permission?