I have a project where the previously installed metal decking is now under designed for the new roof loading. I am wondering if anyone has encountered this before. I'm looking for a way to increase the moment capacity.
I have a couple thoughts on how it could be done:
-Attach metal bar to the bottom chord of the panels
-Attach metal sheets to the bottom chord of the panels.
I haven't checked through the numbers completely, but i'm looking for what other people have done in the past, or some standard details from manufactures (Which I haven't been able to find).
Thanks in advance
I have a couple thoughts on how it could be done:
-Attach metal bar to the bottom chord of the panels
-Attach metal sheets to the bottom chord of the panels.
I haven't checked through the numbers completely, but i'm looking for what other people have done in the past, or some standard details from manufactures (Which I haven't been able to find).