BadgerPE
Structural
- Jan 27, 2010
- 500
I am working on a retrofit to an exiting post frame building and I am having a bit of trouble getting the posts to pass. I have partial calcs from the original design and as far as I can tell, the designer used a Cr value of 1.35 for the built-up (3) ply posts per NDS 2001 standards. I have not been able to locate that factor in the 2001 NDS. Does anyone know where this factor may have come from? NFBA? I highly doubt I will be able to prove that the new posts work if I have to reduce the Cr factor to 1.15 per current NDS standards.