Berniedog
Structural
- Dec 19, 2005
- 200
We have a 2" concrete topping on concrete plank. What is standard practice?
Is advisable to sawcut the topping?
If so would you cut 1/4 of the depth?
What kind of spacing would be used?
Is advisable to sawcut the topping?
If so would you cut 1/4 of the depth?
What kind of spacing would be used?