Newgrad AZ
Structural
- Oct 5, 2023
- 5
Hi. I have been tasked with specifying two light unidentical prefab buildings in a desolate region. Screw pile seems to be the most economical option for the foundations. The client is very much against doing any geotechnical investigation on the site. Though it is a common practice to supply the screw pile contractors with just the foundation reactions so that they would install the piles without the need for any geotechnical inputs. However, I am concerned about the possibility of difference in settlement between the buildings and its effects on the pipes that run between the buildings supported on their exterior walls on the either sides. Could any analysis be done on this issue without having geotechnical parameters of the site?