keewan
Civil/Environmental
- Jul 11, 2015
- 23
I was attending municipality discussion about building design(to listen only),and through the discussion the municipality employee tell that since the building is ductile the calculation of shear done by etabs is not enough(gravity shear) ,and he open the details summary of a member, which include moment , shear and design,etc and said that you have to check another type of shear since the building is ductile ,you have to take positive moment right and negative moment left from summary page and divide by span to get shear, and he told us that etabs calculate this as well
I think that my boss didn't understand ,so I am here asking what exactly he was looking for?
Note: The building we design is ductile since there are no drop beams only hidden beams.
I think that my boss didn't understand ,so I am here asking what exactly he was looking for?
Note: The building we design is ductile since there are no drop beams only hidden beams.