ChrisL
Civil/Environmental
- Dec 25, 2000
- 4
Assigned to a bridge construction project with pile driving within the river. Must contain silt during pile driving operations or be shutdown due to fish breeding season. Any suggestions. Average depth is 6-8 feet in most locations, but very fast moving.