marballe
Civil/Environmental
- Apr 9, 2013
- 2
The approved ICPR model is too large to manage and run. It contains a huge network of stage/area nodes that connected with pipe, channel, or weir links.
My question is: how would one simplify an ICPR model to a more manageable model? How to combine multiple stage/area nodes that share the same downstream basin into a single node? And when you combine nodes, what other parameters do I have to change to maintain the similar node's characteristics?
Please advise. Thanks.
My question is: how would one simplify an ICPR model to a more manageable model? How to combine multiple stage/area nodes that share the same downstream basin into a single node? And when you combine nodes, what other parameters do I have to change to maintain the similar node's characteristics?
Please advise. Thanks.