The EPC is saying that the piping connections to his skid MUST be subjected to those loads all the time? What? Unless there's something odd about the skid that you haven't mentioned, that makes no sense.
If he's worried about your pipe support just outside the skid, you can apply the external force vector, with the same magnitude as the allowable loads provided, at those connections to make sure the support loads are still adequate. If so, the initial load case example provided still applies.
But seriously, ask him what he's talking about. The skid piping connection can handle x (loads given to you). The piping outside the skid being analyzed by you will result in y (loads determined by Caesar). As long as y < x and your supports can handle y, everything is fine.