mrengineer
Structural
- Feb 11, 2002
- 157
I need to detail connection of PT flat plate, 8" thick, to core wall which is constructed in advance of the surrounding slab. When using dowel bar substitutes for such a connection, do you use one line of dowels at slab mid-depth, a line of dowels in top and bottom of slab, or what?