amicka
Civil/Environmental
- Aug 2, 2005
- 18
We're trying to replicate the work done in an older version of HydroCAD using version 9.00. We are getting message 49 "Hint: Tc<2dt may require smaller dt" for one of our subcatchments. The Tc is 5.8 minutes.
Our dt was set at 0.50, which we reduced to 0.10, but the message remains.
What do we need to change to satisfy the program and get rid of this message? Or is this something that should not concern us?
Our dt was set at 0.50, which we reduced to 0.10, but the message remains.
What do we need to change to satisfy the program and get rid of this message? Or is this something that should not concern us?