Hi all
I am getting this error when I give MPC tie/beam/link between two parallel plates could anyone please tell me the reason and how to rectify it.
Solver problem. Zero pivot when processing D.O.F. 1 of 1 nodes. The nodes have been identified in node set WarnNodeSolvProbZeroPiv_1_1_1_3_3.
Solver problem. Zero pivot when processing D.O.F. 2 of 2 nodes. The nodes have been identified in node set WarnNodeSolvProbZeroPiv_2_1_1_3_3.
What should we do if we have connect to parallel plates without bolts? Only MPC tie/beam/link between two plates notes in the contact is enough or we have give some other constraint also?
I was stuck with this for long.
Thanks in advance
I am getting this error when I give MPC tie/beam/link between two parallel plates could anyone please tell me the reason and how to rectify it.
Solver problem. Zero pivot when processing D.O.F. 1 of 1 nodes. The nodes have been identified in node set WarnNodeSolvProbZeroPiv_1_1_1_3_3.
Solver problem. Zero pivot when processing D.O.F. 2 of 2 nodes. The nodes have been identified in node set WarnNodeSolvProbZeroPiv_2_1_1_3_3.
What should we do if we have connect to parallel plates without bolts? Only MPC tie/beam/link between two plates notes in the contact is enough or we have give some other constraint also?
I was stuck with this for long.
Thanks in advance