So I am doing a bit of a feasibility study on different Plant Design types of software. Does anyone have an experience how long the modelling of a cable tray support (typical) and then the placing of that would take?
I would say there's three parameters:
1. Creating the typical (x minutes)
2. Placing the typical in the main environment (y minutes / support)
3. Fixing any clashes or redesigning the typical supports (z minutes)
Anyone have an experience here or can point me in the right direction?
Much appreciated!
Thanks,
Robert
So I am doing a bit of a feasibility study on different Plant Design types of software. Does anyone have an experience how long the modelling of a cable tray support (typical) and then the placing of that would take?
I would say there's three parameters:
1. Creating the typical (x minutes)
2. Placing the typical in the main environment (y minutes / support)
3. Fixing any clashes or redesigning the typical supports (z minutes)