red22
Structural
- Dec 20, 2006
- 23
I have a mezzanine floor framed with open web steel bar joists 2'-0" o.c., 9/16" 26 gage steel form deck, 4" total depth slab with 6x6-W2.1xW2.1 WWF. The contractor would like to put a 14,000 pneumatic tire lift on the slab. Actually, they put the lift on the slab without asking and then were told to take the thing off until the EOR approved it. I cannot find a way to make this work by the numbers even though it did work in reality. Any ideas?