Hydrostru
Civil/Environmental
- Dec 15, 2010
- 12
Can I have a steel plate with welded studs on top of a concrete column? The plate will be larger than the concrete column section. I have concern about how the contractor places and vibrates the concrete. Or they could insert the plate after concrete pouring and vibrating? Please advise. Thanks.