BigBakwas77
Structural
- Jul 7, 2016
- 34
I am working on a project for replacement of small (5HP) compressors. Vendor shop drawings show light gravity and lateral reactions. (4.5 kN gravity and 2.0 kN lateral max) Existing slab on grade is a, 8" thick concrete with two layers of rebars. I have no concern if the slab will be able to support the new compressor. But the existing slab has heating tubes within, so I am not allowed to drill it through to connect the new equipment to the slab. Existing compressor was glued to the slab. I do not have any experience with gluing mechanical equipment to concrete slab. Can someone with previous experience in this matter point me in the right direction?