1906
Chemical
- Jun 30, 2003
- 49
Recently we experienced plugging of strainers(60 mesh) at the inlet of ejectors installed at the vacuum tower overhead in our refinery, to solve this problem questions were made as below. Actually, we want to remove strainer and avoid any operational interuption by the plugging of strainer during normal operation. If you guys have good comments, please let me know.
a) Reason of strainer installation at the inlet of ejector
b) Side effect in case of removing strainer
c) General Mesh size(if installation of strainer is general
practice).
a) Reason of strainer installation at the inlet of ejector
b) Side effect in case of removing strainer
c) General Mesh size(if installation of strainer is general
practice).