gzdee
Civil/Environmental
- Mar 4, 2016
- 8
Hi everyone, I am a new ETABS user and I was designing an eight-story steel structure but I realized that my structure period is too large than I decided to model a simple one story steel structure which has moment connections along perimeter and pinned connections at inner beam. All secondary beams and pinned girders has composite beam action. The structure has no additional mass or load -just under its own weight- and Its period is again 0.411.
Sorry asking, it is hard to answer without seeing. But what could I have done wrong possibly?
Sorry asking, it is hard to answer without seeing. But what could I have done wrong possibly?