hgordon
Chemical
- Jan 23, 2018
- 33
Hi there,
I am looking to install a 150 PE main underground with heat-fused welded joins , the PE elbows up at both ends and termiantes near ground level.
Then a flanged connection will join steel pipe from a pump at one end to a valve room at the other end.
I am wondering if I need to concrete any of the pipe for thrust force protection?
I understand that welded PE pipe is monolithic and should not need thrust blocks on its underground elbows, however the steel pipe flange connection is that restrained enough?
Also the steel pipe to steel flange adapter is a viatulic grooved coupling - not welded.
Please refer to attached PDF.
Thanks!
I am looking to install a 150 PE main underground with heat-fused welded joins , the PE elbows up at both ends and termiantes near ground level.
Then a flanged connection will join steel pipe from a pump at one end to a valve room at the other end.
I am wondering if I need to concrete any of the pipe for thrust force protection?
I understand that welded PE pipe is monolithic and should not need thrust blocks on its underground elbows, however the steel pipe flange connection is that restrained enough?
Also the steel pipe to steel flange adapter is a viatulic grooved coupling - not welded.
Please refer to attached PDF.
Thanks!