How critical is time at temperature when normalizing carbon steel?
Specifically, if the mill supplies green material with test coupons normalized for 1 hour/ inch, and the fabricator normalizes the part for 1/2 hr / inch, is there reason to be concerned that the test coupons don't properly represent the part?
Specifically, if the mill supplies green material with test coupons normalized for 1 hour/ inch, and the fabricator normalizes the part for 1/2 hr / inch, is there reason to be concerned that the test coupons don't properly represent the part?