I agree that the OP's guestimated times are long for erecting JUST THE TANK.... !
However, the site preparation before tank fabrication can begin is very, very important
(i.e. will the tanks have a concrete or clay foundation ?)
Although rare, in swampy, icky areas, some large tanks can require piles for support!
As stated above, the choice of internal and external coatings and the rquired length of time to apply the coatings can certainly affect the schedule.
Like all of Canada, tanks must be hydrotested and certified in Alberta... this affects schedule
Before petrochemical tanks can be filled, fire protection systems must be in place
So....... sxz.......... What exactly did you mean by "erecting the tank" ???