When we complete a time study, the production from the floor never achieves the theoretical volume the time study indicates we should get. When an operation is not controlled by another process such as a machine opening and closing, operators doing "Bench Work" achieve a percentage, say 85% of what a time study indicates. Is there an industry accepted standard for this, and where could I find information on it?