IsaacStructural
Structural
- Dec 1, 2010
- 172
Can anyone give a rough estimate of the time to drill 3" or 4" DIA. vertical holes through 4.5" of LW Concrete? I'm looking to reinforce an existing composite slab by drilling cores, welding on new studs and then filling with non shrink grout, and I'm looking for a rough estimate of the time involved to drill the cores.
One Architect I know thought it would take an hour per core, which seems absurdly high, I'm thinking more like 10 minutes each core, but that is just a gut feeling. I'm curious to know if someone with experience doing this could give a more accurate answer.
Thanks!
Licensed Structural Engineer and Licensed Professional Engineer (Illinois)