whynotreuse
Mechanical
- Feb 4, 2012
- 2
Hey there: I need to control 4-6 on functions per day for a on time of 5-30 seconds per event. I am a mechanical guy so out of my depth with the wires. The system is 12 volt for a greenhouse irrigation system. Thanks!