whynotreuse
Mechanical
Hey there: I need to control 4-6 on functions per day for a on time of 5-30 seconds per event. I am a mechanical guy so out of my depth with the wires. The system is 12 volt for a greenhouse irrigation system. Thanks!
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.