DoubleStud
Structural
- Jul 6, 2022
- 491
I have a project where I have those crazy slim overhang roof. It cantilevers 8.5 ft with 75 psf snow load. I end up using W8 steel beam spaced at 5 ft on center (3.5 ft projected with the slope). Then I have 2x8 spaced at 24" o.c. that connect from steel bm to steel bm. I am considering just using toe nails into packed web instead of using gazillion face mount Simpson hangers. The number checks but part of me feel like I should avoid toe nailing rafters. Thoughts?