dimitp
Structural
- Jan 12, 2015
- 12
Hi, i am completely new to this forum and i have decided to join and ask people for help. I'm to embarrassed to ask my colleagues so i will ask you. I have a simple problem that has been on my mind for a while now. see pic below:
Now, what i dont seem to understand is this. If i put tolerances acc to iso 2768 corase the first hole will be 5,3mm the second hole will be 7,6mm and the last hole will be 7,9mm as a maximum value.
If those holes are to be lined up with holes underneath on another part with the same tolerance and fastened with a 2,9 mm self tapping screw that requires a 2,4 mm hole with -0 +0,1 tolerancee the part will be wrong.
The only way i can fix it is by setting the tolerances to +0,03 and -0 which is way to tight. How am i supposed to think when placing tolerances? i always end up with these very tight tolerances?
I would be so grateful for any replies.
Thank you in advance.
/D
Now, what i dont seem to understand is this. If i put tolerances acc to iso 2768 corase the first hole will be 5,3mm the second hole will be 7,6mm and the last hole will be 7,9mm as a maximum value.
If those holes are to be lined up with holes underneath on another part with the same tolerance and fastened with a 2,9 mm self tapping screw that requires a 2,4 mm hole with -0 +0,1 tolerancee the part will be wrong.
The only way i can fix it is by setting the tolerances to +0,03 and -0 which is way to tight. How am i supposed to think when placing tolerances? i always end up with these very tight tolerances?
I would be so grateful for any replies.
Thank you in advance.
/D