Hello i am a little new to engineering and i have just been asked to do a tolerance stack analysis on a project i am working on.
Attched is a picture that shows a machined from solid chassis with two steps in it, on the top step PCB-2 is fixed and on the bottom step PCB-4 is fixed.
On the base of the box there is a raised section which PART-2 sits and terminates at the top toPCB-4, on the right of Part-2 is PART-2 this sits slightly lower in the chassis and its terminals are connect to PCB-4 through SPACER-3.
On the top face of PCB-2 and PCB-4 is another PCB (PCB-1 & PCB3) mounted on spacers (sopacer-1 and spacer 2)
.
Could sombody please show me an example of how to do a toleance stack on this.
Datum would be from the top of the chassis i think??
Chassis tolerance = +/-0.15
spacers +/- 0.1
part-2 +/- 0.2
part-1 +/- 0.25
pcb-1,2,3 & 4 +/- 0.3
Thank you, any help would be very much appresiated.
Attched is a picture that shows a machined from solid chassis with two steps in it, on the top step PCB-2 is fixed and on the bottom step PCB-4 is fixed.
On the base of the box there is a raised section which PART-2 sits and terminates at the top toPCB-4, on the right of Part-2 is PART-2 this sits slightly lower in the chassis and its terminals are connect to PCB-4 through SPACER-3.
On the top face of PCB-2 and PCB-4 is another PCB (PCB-1 & PCB3) mounted on spacers (sopacer-1 and spacer 2)
.
Could sombody please show me an example of how to do a toleance stack on this.
Datum would be from the top of the chassis i think??
Chassis tolerance = +/-0.15
spacers +/- 0.1
part-2 +/- 0.2
part-1 +/- 0.25
pcb-1,2,3 & 4 +/- 0.3
Thank you, any help would be very much appresiated.