Electrical
- Oct 25, 2001
- 32
I have a 60MVA Transformer which has had a DGA carried out as I am switching it out for routine checks in a months time. The analysis looks normal apart from one result. The Ethane content, instead of being around 10 ppm is 42ppm. Should I be worried so early into the life of this 1 year old transformer ?? Any practical guidance welcomed...:-(