Guest
Kindly, any one help that we have recently erected Boiler feed pump and we want to commissinon the pump in recirculation mode as the other system is not ready. The path is BFP to Deaerator through ARC ( Modulation type). Whether is this advisable to commission the pump? Whether to close the deaerator vent or open? Pump can develop 200 bar pressure and temp rise across the pump is 11 deg.c. Just we want to run the pump in recirculation without steam inlet to deaerator. Can anybody suggest? How to go about it?
thanks
mah99
thanks
mah99