propell
Structural
- Oct 25, 2006
- 2
I am currently working on a project in which the next phase requires me to underpin a 7 story masonry building. the building is approx 70' long and i must underpin it 10' deep. the water table is 9' feet below grade the footing of the building is 12' below grade. I must bring it to 22' below grade. I understand that when i dewater below the buildings footings i will undermine the structure. I am considering helical piles or resistance pile to support the building and then dewatering and underpinning. Please if any one can give me some tips or ideas it will be greatful, thanks.