I've been receiving the warning {node} Exceeded Pond x by x.x' @ x.x hrs
For my project specifically I've gotten Warning: Pond 7P Exceeded Pond 4P by 11.12' @ 11.90 hrs. Is there anything I can do for this? I've gone through the forums and messages and haven't found a way lower this. The location of this error and a similar one is located between two bioretention along a steep slope.
For my project specifically I've gotten Warning: Pond 7P Exceeded Pond 4P by 11.12' @ 11.90 hrs. Is there anything I can do for this? I've gone through the forums and messages and haven't found a way lower this. The location of this error and a similar one is located between two bioretention along a steep slope.