iangineer
Mechanical
- Nov 5, 2020
- 68
ASME Sec I, PG-58.5 states "Miscellaneous piping shall include any piping, not otherwise described herein, that extends to or from the boiler proper up to the first stop valve or instrument". Do the requirements of the mandatory certification and ASME Data Forms include the valve or just the piping up to the valve without including the valve itself? In the diagrams, the "Non-boiler external piping and joint" outside Section I jurisdiction begins after the first valve, but the wording in 58.5 makes me wonder if it could just be the piping. There is a flange between the valve and boiler, but 58.5 makes no reference to flanges, only to the first stop valve or instrument.
Also, what does the statement "The ASME BPVC has total administrative jurisdiction(mandatory certification by stamping the Certification Mark with appropriate Designator, ASME Data Forms, and Authorized Inspection) of Boiler External Piping and Joint. The ASME Section Committee B31.1 has been assigned technical responsibility." mean? Do piping and included valves require a stamp directly on them, or should there just be Data Forms that include a stamp with designator and AI approval?
What are your thoughts?
Thank you in advance!
Ian
Also, what does the statement "The ASME BPVC has total administrative jurisdiction(mandatory certification by stamping the Certification Mark with appropriate Designator, ASME Data Forms, and Authorized Inspection) of Boiler External Piping and Joint. The ASME Section Committee B31.1 has been assigned technical responsibility." mean? Do piping and included valves require a stamp directly on them, or should there just be Data Forms that include a stamp with designator and AI approval?
What are your thoughts?
Thank you in advance!
Ian