Hi,
I wonder whether anyone can help me on the following issue:
When we design a retaining wall we need to consider the worst waterpressure situation, i,e, the worse case between site measured water table and assumed water table (roughly about 1m below ground level), but do we need to adopt the same approach in the basement slab design, for example, the uplifitng pressure? I have checked several British Standards, but could not find a clear answer.
I wonder whether anyone can help me on the following issue:
When we design a retaining wall we need to consider the worst waterpressure situation, i,e, the worse case between site measured water table and assumed water table (roughly about 1m below ground level), but do we need to adopt the same approach in the basement slab design, for example, the uplifitng pressure? I have checked several British Standards, but could not find a clear answer.